5 Simple Statements About plat bolong Explained
Blow-out failure: failure is characterized via the lateral spalling of concrete during the proximity with the anchor's head. This type of failure happens for anchors (prevalently cast-in-location) put in close to the sting in the concrete ingredient.Dengan mematuhi standar ini, para insinyur dan kontraktor dapat memastikan bahwa struktur bangunan y